fbpx
Monday, May 19, 2025
  • HOME
  • ENTERTAINMENT
  • SPORTS
  • LIFESTYLE
  • BUSINESS
  • GENERAL NEWS
  • POLITICS
  • WORLD NEWS
  • TV
  • RADIOS
  • CONTACT US
  • OUR SHOP
No Result
View All Result
Kumasi Online Tv
Kumasi Online Tv
  • HOME
  • ENTERTAINMENT
  • SPORTS
  • LIFESTYLE
  • BUSINESS
  • GENERAL NEWS
  • POLITICS
  • WORLD NEWS
  • TV
  • RADIOS
  • CONTACT US
  • OUR SHOP
KUMASI ONLINE TV
No Result
View All Result
ADVERTISEMENT
Home GENERAL NEWS

Taps to flow in Tema as GWCL completes repair works

Kumasi Online by Kumasi Online
28th April 2021
in GENERAL NEWS
0
16
SHARES
136
VIEWS
Share on FacebookShare on TwitterShare on Whatsapp
ADVERTISEMENT

The Ghana Water Company Limited (GWCL) on Tuesday started pumping water from the Kpong Treatment Plant through its 42 inches’ diameter pipelines after completion of repair works.

GWCL therefore assured residents of Tema and its environs who had lived without water flowing through their taps during the replacement of 120 metres of its aged steel pipe from Thursday April 22, to Sunday April 25, 2021 that the situation would return to normalcy.

Two days after the completion of the repair works, residents in the affected areas were yet to get water; leading them to source for water from tankers while some benevolent churches and assembly men also provided water to them.

The Ghana News Agency observed that places such as the Pentecost Church at Tema Community Four had long queues of yellow gallons and other receptacles at places where water was flowing.

The Tema Regional Communication Manager of GWCL, Mr Sampson Ampah, told the Ghana News Agency that residents would by the close of day on Tuesday, get the needed water through their taps.

ADVERTISEMENT

“We completed on Sunday as scheduled, did flushing and disinfection on Monday, as well as integrity test to ensure that all is well,” he said.

Mr Ampah explained that the company started pumping water through one of its pump, but had to cut it due to some interruptions it encountered at the Kpong Treatment Plant, which he said had been rectified.

He added that the water had to be pumped gradually to avoid bursting of the line.

He further explained that, due to the inactivity and dryness of the line for some days, pumping water through the four pumps at once would produce high pressure.

ADVERTISEMENT

“We have started pumping with one because it has been dried for a long time, if we open all, it can lead to a burst,” he said.

He said to ensure that all customers were served, the normal water rationing scheduled was not being used, to enable them pump water to residents of Tema who had been without it for several days.

Previous Post

Real Madrid 1-1 Chelsea: Pulisic gives Blues away-goal advantage

Next Post

Sunyani: Police officers, three others remanded over death of 48-year-old man

Related Posts

GENERAL NEWS

Bawumia: The NPP deserves another term.

26th August 2024
GENERAL NEWS

NPP’s 2024 Manifesto [Full Text]

19th August 2024
GENERAL NEWS

Airbus Scandal: OSP Claims Mahama To Be The “Government Official 1,” But Clarifies Any Misconduct

8th August 2024 - Updated on 9th August 2024
GENERAL NEWS

Ambulance case: “Do not appeal the ruling; you will be further disgraced.” Haruna Iddrisu says

30th July 2024
GENERAL NEWS

In honour of his 64th birthday, Hon. Ken Agyapong makes a sizable donation

17th June 2024 - Updated on 30th July 2024
GENERAL NEWS

The Supreme Court ends the anti-LGBTQI bill case without a decision.

8th May 2024
Next Post

Sunyani: Police officers, three others remanded over death of 48-year-old man

Security in Parliament has been compromised – Alban Bagbin

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

SUBSCRIBE TO OUR CHANNEL

LISTEN LIVE

PLACE YOUR ADVERT HERE

ENROLL NOW +233 550623377

LAST TWEETS




KUMASI ONLINE GH




KOBOKOBO (SEASON 1) EP 1
KOBOKOBO (SEASON 1) EP 2
KOBOKOBO (SEASON 1) EP 3
KOBOKOBO (SEASON 1) EP 4
KOBOKOBO (SEASON 1) EP 5
KOBOKOBO (SEASON 1) EP 6
KOBOKOBO (SEASON 1) EP 7
KOBOKOBO (SEASON 1) EP 8
KOBOKOBO (SEASON 1) EP 9
  • Blog
  • Privacy
  • Advertisement
  • Contact

Connect With Us Online Sales: 0208115183 | 0266777777 | Ads Dept: +233 550623377 © 2017-2024 All Rights Reserved Kumasi Online Ghana .

No Result
View All Result
  • HOME
  • ENTERTAINMENT
  • SPORTS
  • LIFESTYLE
  • BUSINESS
  • GENERAL NEWS
  • POLITICS
  • WORLD NEWS
  • TV
  • RADIOS
  • CONTACT US
  • OUR SHOP

Connect With Us Online Sales: 0208115183 | 0266777777 | Ads Dept: +233 550623377 © 2017-2024 All Rights Reserved Kumasi Online Ghana .

Verified by ExactMetrics